Schedule

Please visit our Pool Reopening page for updated guidlines on how the Aquatic Center is serving the community during this phase!

Ray Williamson Pool

ray-williamsonA six lane 25-yard pool was built in 1970 as an outdoor pool. In 1977 a roof was added to fully enclose the pool. The pool is the home site for Bainbridge Island High School Swimming, Diving, Water Polo teams, Bainbridge Island Swim Club (BISC), and Bainbridge Aquatic Masters team (BAM). In 2012 a solar water heating system was installed to reduce heating costs during the summer month. In 2011 a Hanovia UV system installed to increase water and air quality.

Don Nakata Pool

nakatapoolBuilt in 2001, the 360,000 gallon pool includes a 180 foot water slide, lazy river, sloped beach entry, tot pool, water futures, toddler frog slide, one and three meter diving board, and four 25-yard lap lanes. The facility also houses a spa, steam, and sauna rooms.  In 2011 a Hanovia UV system installed to increase water and air quality.